Project Profile
Project Location: Wisbech, Cambridgeshire
Flexcrete’s concrete repair and protection products have been specified to extend the life of the Commercial Quay marine structure in Wisbech.
Choose a category to filter the selection of projects:
Flexcrete’s concrete repair and protection products have been specified to extend the life of the Commercial Quay marine structure in Wisbech.
High performance, anti-corrosion coating provided for sheet piling in new rail offload areas.
Flexcrete has provided waterproof, anti-corrosion treatment and surface protection for trafficked floor areas at the Norfolk and Norwich University Hospital.
At St Peter Port Docks in Guernsey, Flexcrete’s products were used on one of the largest marine repair and cathodic protection systems ever installed in Europe.
Corrosion protection of steel piling totalling 480m².
Flexcrete’s epoxy modified polymer modified coating Cemprotec E942 chosen for the corrosion protection at Flood Defence Barrier Refurbishment Project.
Flexcrete’s repair and protection system applied to Chester Road Bridge in Manchester, covering an area spanning over 160m².
Flexcrete’s Cemprotec E942 was chosen to provide long lasting corrosion protection of sheet steel piles at Wadebridge Estuary in Cornwall.
Concrete repair and protection of reservoirs suffering from soft water attack as part of a Framework programme over several years.
Flexcrete’s repair and protection system specified for the reinstatement of cover to steel reinforcements inside Prill tower.
Flexcrete’s fully CE marked concrete repair system in compliance with BS EN 1504 was specified and applied for internal and external refurbishment of public housing stock.
Reinstating honeycombed concrete walls.
Flexcrete’s Marine Mortar S was chosen for the repair of deteriorated reinforced concrete sea defence wall as part of Tywyn Coastal Defence Scheme in Wales.
Repairs to soffits of concrete floors and corrosion protection of cast iron support structure.
Corrosion protection to sheet piles in a tidal zone with Flexcrete’s Cemprotec E942.
Flexcrete’s Cemprotec E942 cementitious coating was applied to the cast iron shunt tunnel lining to provide long lasting corrosion protection.
Flexcrete’s anti-corrosion coating Cemprotec E942 was chosen for external corrosion protection on fuel pipeline at Tobago Airport.
Flexcrete’s Cementitious Coating 851 was chosen for the chemical resistant lining of concrete waste water treatment tanks.
Flexcrete’s products were chosen for the repair and protection of 3000m² of concrete on BAFF treatment tanks.
Flexcrete’s products were chosen for the reinstatement and protection of concrete at City of Dunedin Wastewater Treatment Works in Florida.
Flexcrete’s products were chosen for concrete reinstatement and the protection against aggressive chemicals at Battle Waste Water Treatment Works.
Cemprotec E942, an epoxy and polymer modified coating chosen for corrosion protection on ballast tanks.
Flexcrete provides chloride protection with Migratory Corrosion Inhibitor, Cemprotec MCI® 2020, on 3,500m² of concrete deck.
Flexcrete’s Cemprotec E942 was applied at West Bay harbour for the corrosion protection of steel sheet piling in a tidal zone.
Flexcrete’s cementitious coating Cemprotec E942 was chosen for corrosion protection of existing steel sheet piling suffering from ALWC at Brighton Marina.
Flexcrete’s repair and protection system was used for repair and chloride protection of seawater intake tanks and pumping chambers in Dubai.
Concrete repair and protection of a reinforced jetty in a tidal zone.
Cementitious Coating 851 was chosen to provide concrete protection against wave action and chloride induced corrosion at Doha Corniche, Qata.
Flexcrete’s concrete repair and protection system was used at Deal Pier for corrosion protection of steel support structure and reinstatement of concrete encasement.
Flexcrete’s cemprotec coatings where chosen for the corrosion protection of new steel sheet piling.