Project Profile
Project Location: Egginton Bridge, Derbyshire
Flexcrete’s concrete repair and protection system applied to protect a major trunk road bridge from chloride ingress and carbonation.
Choose a category to filter the selection of projects:
Flexcrete’s concrete repair and protection system applied to protect a major trunk road bridge from chloride ingress and carbonation.
Flexcrete’s concrete repair and protection system applied to protect a major trunk road bridge from chloride ingress and carbonation.
Repair and protection of reinforced concrete suffering from salt induced corrosion of the reinforcement.
Waterproofing of bathroom enclosures in a prestigious hotel resort.
Achieving “super fine” architectural finishes on concrete elements.
Flexcrete’s Fastfill used for rapid concrete reinstatement on joint nosings on motorway bridge.
Flexcrete’s Cementitious Coating 851 was specified for Waterproofing of masonry walls to prevent rising damp.
Flexcrete’s products were used for repair, protection and waterproofing concrete structures on Japan highways.
Flexcrete’s Cementitious Coating 851 was chosen to reinstate concrete cover on a 120,000,000 gallon gravity tank.
Cowden railway bridge required a maintenance-free solution to the damaged concrete which was exposing steel reinforcement.
Flexcrete’s concrete repair system was chosen for the concrete repairs on Cocklaw Motorway Bridge, M90, Scotland.
Flexcrete’s fast-setting mortar Fastfill was used at Newquay Airport for the installation of new approach and runway lights.
Flexcrete’s products were specified for chemical and abrasion resistant resurfacing.
Flexcrete’s Monolevel 844SP and Cemprotec E-Floor were used for waterproofing concrete slabs on the Drill Tower at Bristol Fire Station.
Flexcrete’s products were used for temporary waterproofing of floor areas at the Holiday Inn to allow construction work to continue overhead.
Flexcrete’s Cemprotec E942 chosen for the waterproofing and anti-corrosion protection of cast iron and concrete bridge soffits.