Project Profile
Project Location: Wisbech, Cambridgeshire
Flexcrete’s concrete repair and protection products have been specified to extend the life of the Commercial Quay marine structure in Wisbech.
Choose a category to filter the selection of projects:
Flexcrete’s concrete repair and protection products have been specified to extend the life of the Commercial Quay marine structure in Wisbech.
Flexcrete’s E942 has been specified as an environmentally friendly, durable lining to refurbish a surface water drain chamber at Dungeness B nuclear power station.
High performance, anti-corrosion coating provided for sheet piling in new rail offload areas.
At St Peter Port Docks in Guernsey, Flexcrete’s products were used on one of the largest marine repair and cathodic protection systems ever installed in Europe.
Flexcrete’s mortars and coatings applied for concrete repairs and decorative anti-carbonation protection at Boathouse 4, Portsmouth Historic Dockyard.
Flexcrete provided a range of concrete repair and protection products for a 300m long sea wall in the popular holiday resort of Dawlish Warren.
Flexcrete’s concrete repair and protection products were chosen for chloride protection of Sheringham’s concrete shelters on the promenade.
Flexcrete’s concrete repair and protection products provides chloride protection on retaining walls of a swimming pool.
Over 6,000kg of Marine Mortar S, a high performance cementitious repair mortar, was specified for a tidal project at Scour Schemes, Wales.
Corrosion protection of steel piling totalling 480m².
Flexcrete’s epoxy modified polymer modified coating Cemprotec E942 chosen for the corrosion protection at Flood Defence Barrier Refurbishment Project.
Repair, waterproofing and decorative protection of concrete and steel elements.
Flexcrete’s Marine Mortar S was chosen for the repair and protection of La Vallette Bathing Pools, Saint Peter Port, Guernsey.
Flexcrete’s Cementitious Coating 851 was applied at one of the world’s largest natural gas projects, the Gorgon Project in Australia, for enhancement of concrete cover on reinforced concrete caissons.
Flexcrete’s products were chosen for concrete repairs and anti-carbonation protection of a 650m stretch of the Tiverton River Wall, Devon.
Flexcrete’s products were chosen for the repair and protection of the helipad foundations at Wolf Rock Lighthouse, Cornwall.
Flexcrete’s repair and protect system was applied to defective concrete which left steel elements exposed in an aggressive saline environment at Royal Sovereign Lighthouse.
Repairs to chloride contaminated reinforced concrete quay structure.
Flexcrete’s Fastfill was applied for the waterproof pointing of concrete block joints on revetment walls.
Flexcrete’s repair mortar Fastfill was chosen to reinstate concrete and restore Rhyl Coastal Steps back to a safe condition.
Flexcrete’s Cemprotec E942 was chosen to provide long lasting corrosion protection of sheet steel piles at Wadebridge Estuary in Cornwall.
Reinstatement of concrete cover on recently cast abutments.
Refurbishment of weir and enhancement works to ease the passage of fish over the weir.
Flexcrete’s Marine Mortar S was chosen for the repair of deteriorated reinforced concrete sea defence wall as part of Tywyn Coastal Defence Scheme in Wales.
Corrosion protection to sheet piles in a tidal zone with Flexcrete’s Cemprotec E942.
Flexcrete’s fast-setting mortar Fastfill was chosen for the re-pointing and stabilisation of stone faced pier in a tidal zone at Hartlepool North Pier.
Waterproof internal lining to buoyancy cells.
Flexcrete’s Cementitious Coating 851 was chosen for the chemical resistant lining of concrete waste water treatment tanks.
Flexcrete’s Cemprotec E942 was applied at West Bay harbour for the corrosion protection of steel sheet piling in a tidal zone.
Flexcrete’s cementitious coating Cemprotec E942 was chosen for corrosion protection of existing steel sheet piling suffering from ALWC at Brighton Marina.