Concrete Repair Solution to Combat Aggressive Chemical Attack Background Dating back to 1997, Eastbourne Wastewater Treatment Works is located on the seafront at Langney Point in East Sussex. Serving a population of circa 140,000 people across the Eastbourne area, the vast majority of the works is located underground, beneath a fortress-style building. Up to 74… Read more
Tag Results for: e942
3 Results in Projects
Refurbishment of Underground Inlet Chamber at Wastewater Treatment Works
Flexcrete Solution Helps Protect Against Aggressive Chemical Attack Background Southern Water’s Ford Wastewater Treatment Works dates back to 1999 and treats up to 62 million litres of wastewater from more than 130,000 people every day. The plant inlet works required concrete repair intervention as the asset was showing signs of deterioration due to attack from… Read more
Advanced Cementitious Protection for EDF Energy
Flexcrete Products used to Refurbish Surface Water Drain Chamber Background Durable Cementitious Protection that’s Simple to Install CSC Services UK Ltd, a specialist repair and coatings contractor to the power and water industries, was appointed to carry out the application work. CSC Services worked with EDF Investment Delivery in recommending and agreeing suitable products for… Read more
1 Results in News
Cement-Based Technology Used for Steel Protection at Lynemouth Power Station
Cementitious Coating Enables Design Life to be Achieved Cement-based technology has been used to provide anti-corrosion protection to steel at a new materials handling facility under construction at Lynemouth Power Station in Northumberland. Cemprotec E942, a high performance, anti-corrosion cementitious coating, has been specified by Sir Robert McAlpine to protect new steel piling totalling 1,500m2… Read more