Project Location: Cowden Railway Bridge, Lockerbie, Scotland

Posted on in the category Concrete Repair, Civil Engineering & Infrastructure.

Concrete Repair Solution for West Coast Mainline Rail Bridge

Long-term Concrete Repair Solution for West Coast Mainline Rail Bridge

Background

Dating back to 1830, the West Coast main railway line is one of the United Kingdom’s principal routes leading to London and on to Europe.

A concrete structure that takes the railway line underneath the A74, Cowden railway bridge had been suffering from delamination which had resulted in the damaged concrete exposing the steel reinforcement. The Client demanded a long term, maintenance-free concrete repair solution.

The Solution

Monolite – a low density, high build, shrinkage compensated, polymer modified mortar – was specified as it is expressly designed for the repair, rendering and profiling of both vertical and horizontal surfaces. It forms a rapid hardening, low-density mortar, with enhanced polymer properties. As some areas of steel had been exposed to the elements, it was necessary to first apply Steel Reinforcement Protector 841 to provide a corrosion preventative, flexible coating to the steel. Bonding Bridge 842 was then used to enhance the bond between the high porosity concrete and the Monolite repair.

Client

Dumfries & Galloway Council

Contractor

Frank Carruthers & Son