Hinkley Point C: Enhancing the Durability of Precast Concrete Tunnel Segments Hinkley Point C is one of the UK’s most significant nuclear infrastructure projects, with its cooling water system relying on 5.3km of large-diameter seawater intake and outfall tunnels. With a 60-year design life required, enhanced protection of the precast concrete tunnel segments was… Read more